Generator "THE RED ONE"The group's research team AMT intends to carry out a new design, completely different from anything seen until now, wind turbines. It is expected that the commissioning of this new design will be a revolution in renewable energy will be achieved with much greater efficiency and productivity.
Study of the concept.
The place where select the best designs for the various components. Pre-design wind turbine With power chosen as optimal, held the previous design of the turbine. It will establish the technical requirements, including market research and patents. Final design of the turbine It will perform the final simulation model, for which all components are already designed and calculated. Support the certification process Prepare the data sheets of all components, both self-produced and acquired for its certification process. Design Factory The design of the plant will be conditioned by the choice of wind turbine design, such as machinery and instrumentation. Prototype Manufacture of the prototype to obtain actual operating data, analysis of all components and rectified faults. Staff training Staff training and technical workers at all levels of the project (design, manufacture, assembly, etc.). Quality assurance of providers Determination the quality levels are required for the suppliers of both services and products. |